Take a look at the progress on the Wayside Crossing West development off of GSP Exit 105 in Tinton Falls, NJ.
An orthomosaic of the 27-acre plot off Wayside Rd. Tinton Falls under construction and being developed into retail, office, high-tech, and flex space.
( Above) Aerial view looking southeast with Rt. 18 on the far side of the site. Wayside Rd. in the foreground.
(Above) The first walls were raised this past week.
(Below) A rendering from CBRE. You can see the backside of the building from above.
Progression photos and orthomosaic provided by Fish Bowl Media. If you want to learn more about our construction media deliverables or wish to connect about an upcoming or ongoing project, contact today.